Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Suzhou orl power engineering co ., ltd
Home ProductsBoiler Super Heater

100 Ton Boiler Super Heater

China Suzhou orl power engineering co ., ltd certification
China Suzhou orl power engineering co ., ltd certification
It's really a great idea to make cooperation with you.

—— Vipin Bhardwaj

save money and time ,Excellent quality ,prefect service ,Enthusiastic and creative team.Great!

—— Yavorovich Nikolay

Unique creativity, a strong design team, new products, new surprises, every order can bring a lot of profit.

—— Ghaleb Jaber

I'm Online Chat Now

100 Ton Boiler Super Heater

100 Ton Boiler Super Heater
100 Ton Boiler Super Heater
video play

Large Image :  100 Ton Boiler Super Heater

Product Details:
Place of Origin: Zhangjiagang,Jiangsu,China
Brand Name: ORL Power
Certification: ISO9001/SGS/TUV/ASME/EN
Model Number: Customization
Payment & Shipping Terms:
Minimum Order Quantity: Negotiable
Price: Negotiable
Packaging Details: Iron Frame Package
Delivery Time: 50~100 Days
Payment Terms: L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 500Ton/Tons per Month
Detailed Product Description
Name: Boiler Super Heater Usage: Industry/Power Station
Structure: Fire/Water Tube Pressure: High/Low Pressure
Fuel: Coal/Gas/Oil-fired, Water Heat Output: Hot Water/Steam
Dimension(L*W*H): Customization Application: Power Station
High Light:

100 Ton steam superheater

,

Power Station superheater in boiler

100 Ton Boiler Super Heater

 

Boiler Super Heater Specification:
 

The function of Super heater in the thermal power plant is to remove the last traces of moisture from the saturated steam coming out of boiler and to increase its temperature above saturation temperature as per requirement at inlet of steam turbine.

 

Boiler Super Heater Technical Parameter:

 

Description Boiler superheater
Material Alloy steel, Carbon steel etc.SA178,SA192,SA210,SA213
Structure Type Tube Coil
Material standard ASTM, EN or ISO etc.
Dimension Customization
Supply ability 100 ton per month
Manufacturing process Material→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →Bending tube→Assembly→Inspection →RT→Heat treatment (annealing)→Hydraulic pressure test→Painting→ Packaging
Thermal Efficiency Around 95%

 

Company Information

 

100 Ton Boiler Super Heater 0

 

 

Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu Province.

ORL Power is a leading company and exporter of industrial boilers,power plant boilersand boiler parts (including steam drum, membrane waterwall panel,header,economizer, evaporator, superheater,H-fin economizer, spiral fin tube, air preheater, heat pipe, flue etc.), seamless steel tubes/pipes and ERW steel pipes.ORL provides our customer with full range of services including boiler design, fabrication, installation and commissioning, boiler maintenance, and supervision at site. Our product and service include design and manufacture industrial boilers, pressure vessels and tanks, and pressure parts for power plant boilers (600MW, or 1000MW).

 

 

Testing Center

100 Ton Boiler Super Heater 1

 

FAQ

 

 

1. Why choose us?

We are boiler and boiler parts(boiler drum, boiler waterwall panel, boiler economizer, boiler header, boiler cyclone separator, boiler flue pipe, boiler air preheater, boiler pipe, boiler tube)manufacture and we are one of the best suppliers in China.

We ensure the deliver time, high quality, and the best after-sale service for you.

 

2. How to order?
Welcome come to our factory for inspecting and discussion the technical details.

Contact Details
Suzhou orl power engineering co ., ltd

Contact Person: Mr Robin

Tel: +8618550138377

Send your inquiry directly to us (0 / 3000)